O F F S H O R E
PIPELINE


PIPE LAY
Our personnel is well prepared on facing all the challenges that the operation of pipe laiyng on the seafloor can pose. There are three main ways that subsea pipe is laid: S-lay, J-lay and tow-in.
We are capable of laying all the diameter sizes of PEAD pipe and up to 40 inches steal pipe with our vessels and equipment.
TESTING
Prior to any pipe lay operation, we performe Hydratight-test of all the components installed underwater: flanges, gaskets, bolts, nuts.
After every pipe lay operation we perform the precommissioning test on the entire lenght of the pipe.
SHORE APPROACHING
Once the pipe line reaches the shallow water, special techinques are used to pull it in to the shore:
_Pulling the pipe from the barge with a wire passing through a snatch block installed on the shore
_Pulling the pipe from the shore by means of a winch.
LNG OFFSHORE PORTO VIRO
PIPE LINE RECORD HILIGHTS
LNG Pipeline Portoviro

RESULT
Pipeline tested and operative
MAX DEPTH
- 30 mt
WORK
UXO survey, Pipe lay operation, shore approach, precommissioning, spul piece positioning


LOCATION
Porto Viro Italy
PIPE LENGHT
14 Km
CLIENT
Exxon Mobil, Saipem

Krk Island Oil Pipeline

LOCATION
KRK Island Croatia
CLIENT
Mont-Montaza
WORK
Oil pipeline installation
LENGHT
5,7 Km
DIAMETER
36''
Trogir Sewerage Pipeline

WORK
Sewerage PEAD pipeline


LOCATION
Trogir Croatia