top of page
O F F S H O R E
PIPELINE
pipe lay
1/1
PIPE LAY
Our personnel is well prepared to face all the challenges that pipe laying operations on the seafloor entail. A subsea pipe can be laid following three methods: S-lay, J-lay and tow-in. Our fleet and equipment enable us to lay all diameters of PEAD pipe and up to 40 inches steel pipe.
TESTING
Prior to any pipe lay operation, we perform a Hydratight-test of all the components installed underwater: flanges, gaskets, bolts, nuts. Furthermore, once a pipe is laid, we perform the precommissioning test on the entire pipe-length.
SHORE APPROACHING
Once the pipe line reaches the shallow water, special techniques are used to pull it ashore:
_from the barge with a wire passing through a snatch block installed on the shore
_from the shore by means of a winch.
LNG PORTOVIRO
LNG OFFSHORE PORTO VIRO
PIPE LINE RECORD HILIGHTS
LNG Pipeline Portoviro
MAX DEPTH
- 30 mt
WORK
UXO survey
Pipe lay operation
shore approachING
precommissioning
spul piece positioning
LOCATION
Porto Viro Italy
PIPE LENGHT
14 Km
CLIENT
Exxon Mobil, Saipem
Krk Island Oil Pipeline
LOCATION
KRK Island Croatia
WORK
Oil pipeline installation
diameter
36''
length
5,7 kM
CLIENT
MONT-MONTAZA
Trogir Sewerage Pipeline
CLIENT
VODOVO
LOCATION
TROGIR, CROATIA
diameter
30'
length
7 kM
WORK
SEWAGE PEAD PIPELINE
PIPELINE FOR DESALINATION PLANT
WORK
PEAD PIPELINE INSTALLATION
length
1 kM
diameter
98''
CLIENT
aLSTOM
LOCATION
HAITI
bottom of page